You are here: About us / Projects / Middle Marsyangdi, Nepal
Deutsch
English
Friday, 2019-08-23

In the implementation of the hydropower plant on Middle Marsyangdi in Nepal, we were commissioned with the construction, planning and design of the emergency power systems of the power plant control system. After several months of planning, the system was built and put into operation in 2008 by two of our technicians. The operating personnel were then instructed and trained to use the equipment to ensure safe handling.

http://www.bmz.de/de/was_wir_machen/laender_regionen/asien/nepal/zusammenarbeit.html#t6